- | ====== 20171208 ====== | + | ====== 20171208 |
The network issues due to new 10Gb network configuration is resolved.\\ | The network issues due to new 10Gb network configuration is resolved.\\ | ||
We are still waiting for back-uped electric power tests and full water cooling. | We are still waiting for back-uped electric power tests and full water cooling. | ||
Ligne 6: | Ligne 6: | ||
All E5 servers are relocated in the new racks, wired and powered.\\ | All E5 servers are relocated in the new racks, wired and powered.\\ | ||
- | The data servers are upgraded and each hard drive was tested (only two out of order).\\ | + | The data servers are upgraded and each hard drive was tested (only six over six hundred |
We are testing the switches.\\ | We are testing the switches.\\ | ||
More good news comming up on monday. | More good news comming up on monday. | ||